Change everything on one device

In the sensor list of a project, click the gear of the device. The drawer opens on the right.

  1. 1
    Firmware
    Update to 0.8.0 installs the newest signed firmware. When that is not possible the button says why, for example Config only on an ESP8266 or Needs USB reflash on firmware before 0.5.0.
  2. 2
    Change config
    Opens the device builder with the saved setup of this device. You go through Wiring, Power and Timing: sensors, pins, options, the sleep mode and how often each value is sent.
  3. 3
    Send
    The last step shows what changes and checks it against the device. Pick the verify mode, then press Send over the air. The job shows in the drawer right away.

A board on firmware 0.5.0 or later takes new sensors, other pins or another sleep mode this way without a firmware update. A sensor that needs a newer firmware says so in the builder, and the update goes first in the same job. The board itself stays fixed: for another board, flash it with the Device Builder.

No setup saved? Then HydroNode does not know what is wired to the board and cannot change its config. Reflash it once with Reflash via USB in the drawer. Everything after that goes over the air.

Change many devices in one pass

Tick devices in the list. Select group ticks a whole group, the checkbox in the list head ticks every device you see. Bulk change above the list ticks every device you may change. As soon as one device is ticked, a bar appears at the bottom of the page.

In the barWhat it does
3 selectedHow many devices are ticked.
Update firmware to 0.8.0Opens the change dialog straight on its check, with the newest firmware for every ticked device.
Change configOpens the change dialog on its first step, where you pick what changes.
Send commandOpens the Commands tab of the console at the bottom of the project page, for the ticked devices.
ClearUnticks every device.

The same dialog opens from the drawer of one device: the arrow next to Change config, then Bulk change. One device or forty, the same rules apply. Nothing is sent to a board before you press Create jobs. LoRaWAN devices are not part of a bulk change. They take changes one at a time from their gear.

  1. 1
    Change
    Tick what changes and pick the new value. Choose the verify mode, Strict or Lenient. Firmware and config combine into one pass. Choose devices goes on.
  2. 2
    Devices
    Tick the devices, or use Quick pick: All from a template, All with update available, or Clear. With many devices a filter field helps. Check goes on.
  3. 3
    Check & review
    HydroNode checks every device and sorts it into OK, Warning or Not possible. Create jobs starts the change for every device that can take it. The others are skipped.
ChangeWhat it does
FirmwareInstalls a signed release. ESP32 family only. The latest is preselected, withdrawn releases are not offered.
Send intervalHow often the board reports: 1, 2, 5, 10, 15, 30 or 60 minutes.
Add valueSends the WiFi signal (RSSI in dBm) with every reading. WiFi boards only.
Power modeAlways on, Modem sleep, Light sleep, Deep sleep or Hibernate, as far as the chip supports it. A mode none of the picked devices can run is greyed out with the reason, for example SGP30 needs always-on.
Device thresholdsSave below, Radio off below, Standby below and Resume at, in volts per cell. Needs firmware 0.8.0 or a library sketch with onSettings(). See Battery and Power.

Reading the check

The check runs every rule for every device before anything is created. The box Same for every device shows the change most devices get, for example Send interval 10 min → 5 min. Below it, one row per device and one cell per change. A cell is yellow when a device starts from a different value than most, for example differs from the usual 10 min.

The Check & review step of a bulk change with OK, Warning and Not possible and one row per deviceThe Check & review step of a bulk change with OK, Warning and Not possible and one row per device
What is the same for every device sits at the top, below it each device with its result.
ResultMeaning
OKThe device takes the change as shown.
WarningThe device takes the change, but read the reason first. Skipped parts, low battery and a silent device land here.
Not possibleNothing is sent to this device. The reason stands in the row, which is dimmed.
The check saysWhy
Needs one USB reflash to 0.5.0The firmware on the board cannot update itself yet.
ESP8266 takes config onlyFirmware is skipped on an ESP8266. Config parts still go.
Not HydroNode firmwareOwn sketches and ESPHome are not updated by HydroNode.
No saved setup, reflash once with the builderConfig changes start from the saved setup.
EC probe needs always-onA sensor that samples all the time cannot sleep deep. The name comes from your setup.
Outputs need the board awakeRelays and LEDs cannot keep their state in deep sleep.
Deep sleep needs at least 30 sEach power mode has a shortest interval.
A job is still runningOne open job per device. Wait for it or cancel it.
Not reporting, the job waits for its next contactThe device is delayed or offline. The job starts when it is back.
Already reports sensor read errors, Strict may roll backA sensor failed in the last 24 hours. Fix it, or use Lenient for this change.
Changed by hand since the template, your edits are replacedA template apply overwrites the drifted setup.
The configuration is too large for the device.The new config does not fit into the 8 KB config area of the board.
The board cannot change over the airChange config keeps the board. For another board, flash it with the device builder.
MAX1704x needs firmware 0.8.0 or newerThe sensor came with a later firmware. Update the firmware in the same change, or over USB on an ESP8266.
Below 30 % battery you confirm twice. A firmware download is the most power hungry thing a board does. The first click on Create jobs names the weak devices and turns the button into Confirm and create jobs. The second click creates them. If the battery dies during the update, the old firmware starts again, but the board may stay quiet until it is charged.

From Queued to Installed

Every device in a change gets one job. The device drawer draws it as five steps: Queued, Offered, Download, Verify, Installed. The board always starts the step itself, when it checks in. HydroNode never reaches into your network, so a sleeping board picks up its job with its next round. The Firmware column in the device list follows along, for example downloading 34%.

  1. 1
    Queued
    The job exists and waits for the board to check in. A sleeping board shows Waiting for check-in with the time of its next round.
  2. 2
    Offered
    The reply to the next reading carries the update. The board finishes its round first, so no reading is lost.
  3. 3
    Download
    The board checks the signature, then loads the firmware into its free slot and verifies its checksum. An interrupted download resumes where it stopped.
  4. 4
    Verify
    The board restarts into the new firmware and checks itself in its first wake cycle. The check after the restart is described in the OTA guide.
  5. 5
    Installed
    The check passed. The job shows for example "Verified Strict in 41 s", and the saved setup follows the new version.

A config change takes the same path without a download: the board receives the new settings with the reply, keeps its old config, writes the new one, restarts and checks. A change with firmware and config runs the firmware first and the config right after, as one job.

WhenWhat happens
The board is asleepThe job waits for its next round. Nothing wakes a sleeping board early.
Offered three times, not takenThe job fails with "Offered 3 times, not taken". Check the console for refused offers.
The download stalls for 10 minutesThe job goes back to Offered, and the next reply offers it again.
HydroNode was unreachable during the checkThe board rolls back, the job is queued again and tried in a later round, up to five times.
No report after the restartAfter three intervals plus five minutes without a word, the job fails with "No report after restart".
The device changes owner or a share endsJobs the board has not taken yet end when the person who started them no longer manages the device.

A LoRaWAN station takes its interval and thresholds with Change config in its drawer, one station at a time: Battery and Power.

What the board does during an update, the check after the restart and the rollback are explained in Over-the-air updates.

NextTemplates